Fixed dome Biogas plant Overview drawing of 124 m3 fixed dome plant AKUT (2008)

Planing institution: AKUT Partner GmbH Technical drawing showing a design of a fixed dome biogas plant with a volume of 124 m3 and a gas storage capacity of 15 m3. Please note: The drawings are not ready to be used for execution since a number of important construction details are missing. However people interested in it are invited to contact the engineering firm. Contents 1. Technical Drawing: Cross-section of a 124 cbm biogas plant

Bibliographic information

AKUT (2008). Fixed dome Biogas plant Overview drawing of 124 m3 fixed dome plant AKUT Partner GmbH, Berlin, Germany

Filter / Tags

Biogas systems RuralPractitionersTechnical drawingsEnglish

Related Countries

Downloads

124 cbm fixed dome biogas plant.


Type: application/pdf
Size: 0.13 MB

Download

Fixed dome Biogas plant

Published in: 2008
Pages: 0

Publisher:
AKUT Partner GmbH, Berlin, Germany

Author(s):
AKUT

Uploaded by:

Stay in Touch Get the Newsletter !

Stay informed about the activities of SuSanA and its partners. The SuSanA newsletter is sent out around four times per year. It contains information about news, events, new partners, projects, discussions and publications of the SuSanA network.

Subscribe

Are we allowed to crumble with cookies and anonymous tracking?

We use cookies on our website. Some of them are essential for the operation of the site (so called session cookies), while others help us to improve this site and the user experience (tracking cookies). We use the application Matomo and the external service etracker to analyze your behavior on our website anonymously. Because we value your privacy, we are here with asking your permission to use the following technologies. You can change your settings any time via this link or the menu item in footer menu. For more information visit our Data Policy