English (United Kingdom)Español(Spanish Formal International)French (Fr)
Home Biblioteca Biblioteca en línea Local requirements and constraints of O&M of urine diverting dry toilets

Biblioteca en línea

Local requirements and constraints of O&M of urine diverting dry toilets
Final report on O&M research topic

The estimation of transportation costs, which will allow operators to make profit, is affordable to majority of residents in study area and as such there is a high chance for O&M of UDDTs to succeed in Arusha municipality. The important issue here is for the Municipal authority to establish resource-oriented section within the sanitation department to coordinate the processThere has been increase in number of UDDTs by 60% from 5 UDDTs in 2008 to 8 UDDTs in 2009 as a results of availability of masons trained by the ROSA project and promotion activities.


Author:

Senzia, M.A., Markus, L., Elke, M., Kimwaga, R.

Publisher:

ROSA project, Arusha, Tanzania

Year:

2009

Pages:

16

Keywords:

UDDT

Link:


Bibliographic information:
Senzia, M.A., Markus, L., Elke, M., Kimwaga, R. (2009). Local requirements and constraints of O&M of urine diverting dry toilets - Final report on O&M research topic. ROSA project, Arusha, Tanzania.


Document download:

pdf:

Local requirements and constraints of O&M of urine diverting dry toilets
[2.1 MB]


« back to previous page

SuSanA Partners
(currently 202 partners)